bsp; ·產(chǎn)品或β測試系統(tǒng)的問題報(bào)告
·產(chǎn)品系統(tǒng)改進(jìn)的變更請求
·新開發(fā)項(xiàng)目的變更請求該變更控制過程應(yīng)用于由<項(xiàng)目>成員創(chuàng)建或管理的已基線化的工件, 包括:
·已經(jīng)被發(fā)布為產(chǎn)品或處在β測試階段的軟件
·<項(xiàng)目>需求規(guī)格說明書
·小組程序和過程
·用戶和技術(shù)文檔下列工件類被排除在這個變更控制過程之外:
·正在開發(fā)的工件, 不包括在新項(xiàng)目中提出的需求變更
·在項(xiàng)目過程中創(chuàng)建的中間或臨時工件
·任何僅為個人使用的工件
Definitions (定義) Term (術(shù)語) Definition (定義)Issue (變更請求) An item that someone has submitted to the change control system that describes a software problem, a requested enhancement, a proposed change in requirements for a product under development, or a new project being proposed.
已向變更控制系統(tǒng)提交的項(xiàng),它主要描述一個軟件問題,項(xiàng)目中被提出的改進(jìn),以及為正在開發(fā)的產(chǎn)品或一個被提議的新項(xiàng)目在需求方面提出的變更。
Stakeholder (涉眾) Someone who is affected by or who can influence the project.所有會受到項(xiàng)目結(jié)果影響或可以影響項(xiàng)目結(jié)果的人。
Roles and Responsibilities (角色和職責(zé))
Role (角色)
|
Description (描述) |
CCB Chair (變更控制委員會主席) |
Chairperson of the change control board; has final decision-making authority if the CCB does not reach agreement; asks someone to be the Evaluator for each change request and asks someone to be the Modifier for each approved change request變更控制委員會主席,在變更控制委員會成員意見不一致時有最終決定權(quán),并對每個變更請求安排評估人以及對每個批準(zhǔn)的變更請求安排修改人。 |
Change Control Board (變更控制委員會) |
The group that decides to approve or reject proposed changes for a specific project決定批準(zhǔn)或拒絕特定項(xiàng)目中提出的變更請求的團(tuán)隊(duì)。
|
Evaluator (評估人) |
The person whom the CCB Chair asks to analyze the impact of a proposed change由變更控制委員會主席指定對已提出變更的影響進(jìn)行分析的人員。 |
Modifier (修改人) |
The person who is assigned responsibility for making changes in a work product in response to an approved change request; updates the status of the request over time負(fù)責(zé)在一個工件中實(shí)現(xiàn)已被批準(zhǔn)的變更請求,并隨時更新變更請求狀態(tài)的人員。 |
Originator (發(fā)起人) |
The person who submits a new change request提交新的變更請求的 |
項(xiàng)目經(jīng)理勝任力免費(fèi)測評PMQ上線啦!快來測測你排多少名吧~
http://m.opto-elec.com.cn/pmqhd/index.html