Project Manager (項目經(jīng)理) |
The person who is responsible for overall planning and tracking of the development project activities負責整個項目開發(fā)的計劃并跟蹤項目開發(fā)活動的人員。 |
Verifier (驗證人) |
The person who determines whether a change was made correctly負責判斷變更是否被正確執(zhí)行的人員。 |
Change Request Status(變更請求狀態(tài))
Status Changes(變更狀態(tài)) A requested change will pass through several possible statuses during its life. These statuses, and the criteria for moving from one status to another, are depicted in the state-transition diagram in Figure 1 and described in the Possible Statuses table.
在整個需求變更過程中會由幾種可能的狀態(tài)來表示。這些狀態(tài)和從一種狀態(tài)轉(zhuǎn)移到另一種狀態(tài)的條件會在變更請求狀態(tài)的轉(zhuǎn)換圖(圖1)中被描繪出來,并在下面可能的狀態(tài)表中描述。
Notifications(通知) Any time an issue status is changed, the change control tool will send an e-mail notification automatically to the issue Originator, the issue Modifier, and/or the CCB Chair, as specified below.
變更請求狀態(tài)一旦發(fā)生改變,變更控制工具會按照下面所述自動發(fā)一個電子郵件通知發(fā)起人、修改人以及/或變更控制委員會主席。
Possible Statuses(可能的狀態(tài))
Status(狀態(tài)) |
Meaning(含義) |
Approved(已批準) |
The CCB decided to implement the request and allocated it to a specific future build or product release. The CCB Chair has assigned a Modifier.變更控制委員會決定接受此變更并分配其在某個特定版本中執(zhí)行。 變更控制委員會主席指派給一個修改人。 |
Canceled(已取消) |
The Originator or someone else decided to cancel an approved change.發(fā)起人或其他相關人員決定取消已批準的變更。 |
Change Made(實施變更) |
The Modifier has completed implementing the requested change.修改人完成變更。 |
Closed(結(jié)束) |
The change made has been verified (if required), the modified work products have been installed, and the request is now completed.實施的變更已被驗證(如果需要),完成修改的工件已經(jīng)被安裝,此刻需求變更完成。 |
Evaluated(已評估) |
The Evaluator has performed an impact analysis of the request.評 |