估人已經(jīng)進(jìn)行了需求變更的影響分析。 |
Rejected(已拒絕) |
The CCB decided not to implement the requested change.變更控制委員會(huì)決定不作變更。 |
Submitted(已提交) |
The Originator has submitted a new issue to the change control system.發(fā)起人向變更控制系統(tǒng)提交一個(gè)新的變更請(qǐng)求。 |
Verified(已驗(yàn)證) |
The Verifier has confirmed that the modifications in affected work products were made correctly.驗(yàn)證人已確認(rèn)修改在所有受影響的工件中被正確實(shí)施。 |
Figure 1. State-Transition Diagram for Issue Statuses.(圖1,變更請(qǐng)求狀態(tài)轉(zhuǎn)換圖)
項(xiàng)目經(jīng)理勝任力免費(fèi)測(cè)評(píng)PMQ上線啦!快來(lái)測(cè)測(cè)你排多少名吧~
http://m.opto-elec.com.cn/pmqhd/index.html