97.不要懼怕失敗否則你永遠(yuǎn)不可能成功,但是你要時(shí)刻準(zhǔn)備挽回可能的失敗。其中一條就是知道誰能幫你。
Rule #98: One of the advantages of NASA in the early days was the fact that everyone knew that the facts we were absolutely sure of could be wrong. 98. 早先NASA的優(yōu)勢之一就是每個(gè)人都相信我們確信的事情毫無疑問是正確的。
Rule #99: Redundancy in hardware can be a fiction. We are adept at building things to be identical so that if one fails, the other will also fail. Make sure all hardware is treated in a build as if it were one of a kind and needed for mission success. 99.硬件冗余就是一個(gè)幻想。我們善于配置兩個(gè)一模一樣的東西,以至于其中一個(gè)失效,另一個(gè)也會(huì)出問題。確保系統(tǒng)中所有的硬件都被看成是成功完成任務(wù)所必須的那一類中的一個(gè)。
Rule #100: Never make excuses; instead, present plans of actions to be taken. 100. 不要找借口;與此相反,要準(zhǔn)備將要采取的行動(dòng)。